Kainalu Resort in Kuta, Lombok: real construction underway. Current stage 3: roofing and installations (~50%). Projected delivery: Q2 2027.

Updated 26 Oct 2026 · 1 of 6 units available

Current status

The project is under construction. The current stage is Stage 3: roofing and installations (thatch, carpentry, and installations underway; floors laid in the first units). Progress of around 50%.

Next milestone: Stage 4: finishes and handover, projected for Q2 2027.

Construction journal

Each update with its date, stage and real photos from the site. Newest first.

Stage 3 · Roofing and installations Latest

First block with thatch roofing. Second block: roof structure and thatch underway. Interiors with plaster, arches, carpentry, and installations. Floors laid in the first units. Progress: around 50%.

Site view: first block with thatch and second block roofing underway Interior with floor tiles laid and a timber frame opening toward the thatch Crew assembling the roof structure on the second block Interior with arched timber frames and floor tiles laid Plumbing being installed in an arched wall niche Plastered interior with ceiling beams and arched formwork
Stage 2 · Roofing on first units

First units with thatch roofing, arches, and plaster. Interiors with ceiling, conduits, and installations underway. Second block against the hillside, with plaster and structure. Progress: around 50%. Stage 3 (roofing and installations) starts 15 October 2026.

Site view: first units with thatch and second block being plastered Thatch eaves, arches, and plaster on the first units Second block against the hillside, with plaster and bamboo scaffolding Interior plaster with electrical conduits and ceiling work underway Unit interior with plaster, conduits, and a bamboo ladder Bathroom under construction with block walls and bamboo scaffolding
Stage 2 · Block structure

Second units: walls, columns, and chain beams already poured; waiting for them to cure before the roof structure. Thatch roofing is already visible on the first block.

September site: first block with thatch and second block in block structure Second-block interior: block walls and arched timber frame
Stage 2 · Block structure

Full-site view with plastering, arches and structure underway. Inside the units: arched niche, shower area with skylight, and ceiling beams.

Current resort site: plastered units and new block structures Unit interior under construction with arched niche Bathroom shower area under construction with skylight and drain Interior under construction: plastered walls, arched frame, and ceiling beams
Stage 2 · Block structure

Advanced structure on the lot; plastering and carpentry underway.

Site view in August 2026 with advanced structure Crew working on walls and site carpentry
Stages 1–2 · Layout and structure

Initial site layout, block walls under construction and units taking shape on the lot, with the construction crew on site.

General view of units under construction Block walls under construction Construction crew at Kainalu Resort Initial site layout

Schedule stages

  • 1 · Layout & foundations Site clearing and marking units on the lot.
  • 2 · Block structure Walls, columns, plastering, and carpentry. Thatch roofing on the first units.
  • 3 · Roof & installations (current) Thatch, installations, and carpentry underway. Floors laid in the first units.
  • 4 · Finishes & handover Completion projected for Q2 2027.

Projected delivery

Delivery is projected for Q2 2027.

Why it matters for investors

  • Reduces uncertainty versus paper-only projects.
  • Lets you follow progress through to management and rental.
  • Fits the process: reserve → legal structure → construction → management.

Request more photos / updates on WhatsApp Request investor pack